1.
Estimation on LCOE of Offshore Wind Farm
•
Sponsor: Korea Electric Power Corporation
•
Period: Jan. 2025 – Jun. 2025
2.
Designing E-highway 2.0 Policy Package: Part 1
•
Sponsor: Democratic Party’s Research Institute
•
Period: Oct. 2024 – Dec. 2024
3.
Economic Feasibility Study on New Hydro-pump Storages: Hapcheon + Youngyang
•
Sponsor: Korea Hydro & Nuclear Power Co.
•
Period: Oct. 2024 – Sep. 2024
4.
Business Strategy Design of New Electricity and Heat Co-generation Plants
•
Sponsor: Hanwha Energy
•
Period: Oct. 2024 – Apr. 2025
5.
Policy Study for Promoting New Business in Electric Power Industry
•
Sponsor: Korea Institute of Energy Technology Evaluation and Planning (KETEP)
•
Period: Sep. 2024 – Aug. 2025
6.
Conceptual Design of Ancillary Service Market for Grid-forming Resources
•
Sponsor: Korea Electronics Technology Institute
•
Period: Nov. 2023 – Aug. 2024
7.
Developing ISO-DSO Cooperative Operation System
•
Sponsor: Korea Institute of Energy Technology Evaluation and Planning (KETEP)
•
Period: May. 2023 – Feb. 2027
8.
Establishment of Standard Microgrid Model for Creation of Grid-scale Benefit
•
Sponsor: Korea Electric Power Corporation
•
Period: May. 2023 – Oct. 2023
9.
Development of Optimal Power Flow Algorithm in AC/DC Hybrid Grid with Deep Penetration of Zero-Marginal-Cost Resources
•
Sponsor: Korea Electric Power Research Institute (KEPRI) – Basic R&D
•
Period: Jul. 2023 – Jun. 2026
10.
Development of a Model for Estimating Strategic Reserve Requirement for Coping with Abnormal Climate Conditions
•
Sponsor: KEPCO Economy and Management Research Institute (KEMRI)
•
Period: May 2023 – May 2024
11.
Pre-feasibility Study of ‘Dangjin area’ Transmission and Substation Project
•
Sponsor: Korea Electric Power Corporation
•
Period: Jan. 2023 – Jun. 2023
12.
Improvement of Firm-connection Policy of Small-scale Renewable Energy
•
Sponsor: Ministry of Trade, Industry, and Energy, Korea Energy Agency
•
Period: Oct. 2022 – Feb. 2023
13.
Pre-feasibility Study of ‘Goheung and Bosung’ Transmission and Substation Project
•
Sponsor: Korea Electric Power Corporation
•
Period: Jul. 2022 – Oct. 2023
14.
Establishment of Distribution Grid Code for Active Distribution System Operator
•
Sponsor: Korea Electric Power Corporation
•
Period: Mar. 2022 – Mar. 2023
15.
Analysis on Avoided Benefit of Transmission Network Expansion and Policy Study of Overseas Electricity Network
•
Sponsor: Korea Energy Economics Institute
•
Period: May. 2022 – Feb. 2023
16.
Feasibility Study of Grid-stabilizing ESS
•
Sponsor: Korea Development Institute
•
Period: Mar. 2022 – Aug. 2022
17.
Grid Reform Roadmap towards Renewable-oriented System for 2050 Net Zero Goal
•
Sponsor: Korea Electrotechnology Research Institute
•
Period: Mar. 2022 – Aug. 2022
18.
Policy Roadmap and Cost Analysis of Renewable Energy Installation for Net Zero Goal (Storage Mix 2.0)
•
Sponsor: Ministry of Trade, Industry, and Energy, Korea Energy Agency
•
Period: Mar. 2022 – Aug. 2022
19.
Quantifying Benefits of Distributed Energy Resources and Designing Monetary Incentive Scheme
•
Sponsor: Korea Electric Power Corporation
•
Period: Jan. 2022 – Nov. 2022.
20.
Optimal Sizing of Hybrid ESS
•
Sponsor: Korea Electric Power Research Institute
•
Period: Aug. 2021 – Nov. 2022
21.
Feasibility Study of New Young-dong Hydro-pump Plant
•
Sponsor: Korea Development Institute
•
Period: Aug. 2021 – Feb. 2022
22.
Designing Grid Tariff for P2P Electricity Transaction and Establishment of Institutional Improvement
•
Sponsor: Korea Energy Economics Institute
•
Period: May. 2021 – Oct. 2021
23.
Cost Benefit Analysis of Distribution System Operator based on Distribution Planning Model
•
Sponsor: Korea Energy Economics Institute
•
Period: Apr. 2021 – Sep. 2021
24.
Development of Simulator for RE100 Aggregator
•
Sponsor: Electronics and Telecommunication Research Institute
•
Period: Mar. 2021 – Jul. 2021
25.
Finding Optimal Storage Mix for Efficient Use of Renewable Energy
•
Sponsor: Ministry of Trade, Industry, and Energy, Korea Energy Agency
•
Period: Mar. 2021 – Feb. 2022
26.
Reinforcement Learning based Detection and Defense Method for Cyber Attack on Distribution System State Estimation with False Data Injection
•
Sponsor: National Research Foundation
•
Period: Mar. 2021 – Feb. 2024
27.
Reliability-Centered Maintenance Strategy of Power System for Semiconductor Factory
•
Sponsor: Samsung Electronics
•
Period: Jan. 2021 – Oct. 2021
28.
A Study on Regulatory Scheme of Network Tariff for Incentivizing Efficient System Investment
•
Sponsor: Ministry of Trade, Industry, and Energy, Korea Energy Agency
•
Period: June. 2020 – Mar. 2021
29.
Development and Demonstration on Power Origin-traceable Blockchain-based RE100 Certification and Brokerage Transaction System
•
Sponsor: Korea Institute of Energy Technology Evaluation and Planning (KETEP)
•
Period: Dec. 2020 – Nov. 2023
30.
Future Transmission and Substation Planning for Siheung City
•
Sponsor: Siheung City
•
Period: Sep. 2020 – Dec. 2021
31.
Development the Brokerage Market Model and Ancillary Serivce using DERs
•
Sponsor: Korea Electric Power Research Institute (KEPRI)
•
Period: Mar. 2020 – Jun. 2023
32.
Exploring Feasible Renewable-oriented Generation Mix as an Alternative of Current Carbon-intensive Energy System in South Korea
•
Sponsor: European Climate Foundation
•
Period: Mar. 2020 – Dec. 2020
33.
Finding Optimal Combination of Distributed Renewable Energy Sources for Virtual Power Plant with Minimum Output Variance
•
Sponsor: Haezoom Inc.
•
Period: Mar. 2020 – Feb. 2021
34.
Development of XAI-based Technology for Smart Energy Platform
•
Sponsor: Korea Electric Power Research Institute
•
Period: Mar. 2020 – Feb. 2021
35.
Improving Modeling of Short-term GHG Emission in Power Industry
•
Sponsor: Ministry of Environment-GHG Inventory and Research Center
•
Period: May. 2020 – Nov. 2020
36.
Business Model of Cloud Energy Storage System for Multi-Flexibility Provider
•
Sponsor: SK SUPEX COUNCIL, SK Innovation
•
Period: Sep. 2019 – Jan. 2020
37.
Feasibility Study of Imbalance Settlement in Korea Electricity Market
•
Sponsor: Korea Power Exchange
•
Period: Jul. 2019 – Apr. 2020
38.
Policy Study for Achievement of the Paris Agreement against Climate Change [Participated researcher, Kangwon National University Lawschool]
•
Sponsor: Korea Legislation Research Institute
•
Period: Jun. 2019 – Oct. 2019
39.
Policy Study for Smart Metering based on Platform Business Model
•
Sponsor: Korea Electric Power Research Institute (KEPRI) [Co-project investigator]
•
Period: May 2019 – Oct. 2021
40.
Policy Study for Net Metering [Co-project investigator]
•
Sponsor: Korea Electric Power Research Institute
•
Period: May 2019 – Oct. 2019
41.
Modelling of Short-term GHG Emission in Power Industry using Open-source Language (Python)
•
Sponsor: Ministry of Environment-GHG Inventory and Research Center
•
Period: Apr. 2019 – Sep. 2019
42.
Analysis on Impacts of Coal Phase-out Policy in Chungnam Province
•
Sponsor: Chungnam Research Institute
•
Period: Mar. 2019 – Mar. 2021
43.
Designing Corporate Sourcing Scheme of Renewable Energy in Korean Power Industry
•
Sponsor: Greenpeace Seoul Office
•
Period: Jan. 2019 – May. 2019